Tcho Dmitry

Birth date: 1977.06.26

Place of residence: Moscow, Russia

Mobile tel.: +7 (915) 208-2860

E-mail: tchodima@mail.ru      ICQ: 149-751-695

<обратно в Русский>       <fotoplenka>


Education:

2001 – 2004

CANDIDATE OF TECHNICAL SCIENCES (Ph.D)

Moscow Power Engineering Institute (Technical University) (http://www.mpei.ru/)

Power Stations Department (http://es.mpei.ac.ru/), post-graduate course

The subject of my Ph.D thesis is “The influence of electric arc on infeed from asynchronous motors during the short-circuit in the a.c. installations with voltage below 1kV”. The result of my research is the new principles of calculation the short-current in installations with the asynchronous motors.  I’ve developed the mathematical model of electrical installation with the motor. The model based on the Gorky-Park’s simultaneous differential equations and was actualized in MATLAB software. With the model I’ve investigated the theoretical part or my research. Also I’ve carried out the experiment with the active electrical installation with the async. motor. The practical part of my research based on the results of this experiment.

1995 – 2001

ENGINEER-ELECTRICIAN DIPLOMA (Dipl. El.-Ing.)

Moscow Power Engineering Institute (Technical University)

Power Stations Department

The main courses were: the electrical equipment of power stations, the calculation of short-circuit current, designing of electrical part of power stations and substations and others

Experience:

from 2003

APPRAISAL ENGINEER, PROJECT MANAGER

Energon” company (http://www.energon.ru), Project Department

COMPANY’S DESCRIPTION: power equipment suppliers for DC electrical installation (accumulator batteries, chargers, switchboards, invertors, DC motors) 

FUNCTIONS: project examination of electrical part, customers advisor, electrical installations designer, project management (assembling, dismantling etc), putting the installation into operation.

CUSTOMERS: RAO EES Rossii (Orenburgenergo, Astrakhanenergo, Nijnovenergo), GAZPROM (Mostransgaz, Orenburggazprom, Urengoigazprom, Yugtransgaz, Uraltransgaz, Yamalgazinvest, Gazcomplektimpex), Russian Railways (Moscow Railways, Far-East Railways)

2001 – 2003

CHIEF TECHNOLOGIST

“Modus” company

FUNCTIONS: working out the simulators of electrical installations for personnel training

CUSTOMERS: Power Stations of Moscow Power System (#8, #12, #17, #20, #25), Nijegorodskaya and Voljskaya Hydroelectric Power Stations, the Hanty-Mansyisk Distribution Network

2001 – 2003 гг

RESEARCH ASSISTANT

Moscow Power Engineering Institute (Technical University)

Power Stations Department

FUNCTIONS: assistance in department’s scientific researches. Have designed the electrical part of Anadyr Wind Plant. Working out the power equipment database in MS Visual Basic

2000 – 2001 гг

ELECTRICAL ENGINEER

“VEPR” company (http://www.vepr.ru/)

FUNCTIONS: designing the diesel getsets’ electrical circuits, designing of the off-line distribution network. Project feasibility study. The gensets’ capacity I worked with is up to 150kW

Languages:

Russian (fluent), English (speaking)

PC:

MS DOS, MS Windows, MS Office, MS Access, MS Visual Basic, Fortran, Adobe AutoCad, Mathsoft MathCad, Mathworks MathLab, Adobe Photoshop

Sport:

Swimming, Skiing, Ping-pong, Tennis


Используются технологии uCoz